Ring us today! We'll be on our way

01995 606311

News archive August 2019

Ex Display Items Now On Sale!

Posted on 30th August 2019

We still have some fantastic offers available in our ex-display sale! ECO Integra Kashmir – Bull Back to wall pan with soft close seat £165.00 INC VAT Mereway Sargasso Pumice Satin – Lustre Ice White Composite Worktop £450.00 INC VAT  Zehnder Radiator £50.00 INC VAT Pure Fusion £245.00 INC VAT Burlington Cloakroom £225.00 INC VAT […]

Our range of delivery options.

Posted on 23rd August 2019

At C & C Supplies we pride ourselves in covering a range of areas, with a fleet of; 7.5 tonne rigid 44 tonne arctic 18 tonne rigid with crane 38 tonne drawbar with crane 32 tonne rigid 44 tonne drawbar with crane Did you know we cover the following areas? Knott End, Hambleton, Preesall, Pilling, […]

OFF MAINS sewage treatment solutions

Posted on 5th August 2019

Ensign The Marsh Ensign is widely regarded as one of the most efficient, reliable and economical sewage treatment plants on the market. Tested and approved to BSEN12566-3/A1:2009 all Ensign units provide treatment well within national consent requirements. Published test results of 1.5:19.2:8.4mg/ltr (BOD:suspended solids:ammonia), with influent concentrations on test higher than those chosen by most […]

Is your septic tank 2020 compliant?

Posted on 5th August 2019

Environmental Permitting (England and Wales) (Amendment) (England) Regulations 2014 came into force on 1 January 2015 and created General Binding Rules (GBRs) for septic tanks or small sewage treatment plants for domestic use. These rules are designed to reduce the level of pollution from sewage in the nation’s watercourses. Under the new General Binding Rules, […]